We Already Have 100' of Right of Way (ROW) on Beulah Road--We need 104.5

I have asked staff for the map and they have provided it.  We need 104.5 feet total to upgrade Beulah Road from a two-lane road to a four-lane connector that will eventually tie into I-10.  The segment of  this roadway that will be constructed south of I-10 and north of 9-mile road will require just 104.5 feet---and we have 100 feet already!  We will not be swallowing subdivisions or homes to build this.

Here is the map and overlay (not precisely to scale, but much more so than the DOT/Atkins renderings) that shows the county already possesses nearly enough ROW to do the project.


No comments:

Post a Comment

Abusive, profane, and/or off-topic posts will not be allowed. Unprovoked ad-hominem attacks will not be tolerated. All posts are subject to moderation, posts that violate these policies, spam, posts containing off-color language, and any other inappropriate comments or content, as determined by the blog administrator, will remain in moderation and may not be added on the site. This site is not my campaign site, but in an abundance of caution I will offer the below disclaimer.