Wednesday, August 21, 2019

9-Mile Road Lane Shift in Beulah is Coming Monday

This coming Monday morning, the traffic on 9-Mile Road in Beulah will shift as depicted above....
Beginning this Monday, the switch to the south side of the recently painted and striped 9-Mile Road section from Leisure Lakes to just before the 11-Mile Creek Bridge will occur.

This change will allow crews to begin repaving and re striping work on the currently-utilized north half of what will eventually be the 2 westbound lanes of 9-Mile Road.

In speaking with NFCU leadership, this change may represent a significant challenge as the deceleration lane leading into the campus will no longer be accessible under this temporary configuration--which may have the effect of backing traffic up further to the east on 9-Mile road than what is currently happening.  So although this shift is temporary--it will exacerbate the existing traffic bottleneck in this area, particularly during morning and evening rush hour.

I want constituents to be aware of this change so that they can make alternative route decisions if they so choose.  This shift is scheduled for THIS COMING MONDAY NIGHT--August 26th.

The latest information I have heard is that the 4-lanes will be complete between exit 5 and the NFCU campus main entrance by this November, and 4 complete lanes all the way to Beulah Road by March of next year.

No comments:

Post a Comment

Abusive, profane, and/or off-topic posts will not be allowed. Unprovoked ad-hominem attacks will not be tolerated. All posts are subject to moderation, posts that violate these policies, spam, posts containing off-color language, and any other inappropriate comments or content, as determined by the blog administrator, will remain in moderation and may not be added on the site. This site is not my campaign site, but in an abundance of caution I will offer the below disclaimer.